Blog

Technical articles and insights on NEXSPC and Statistical Process Control (SPC).

Keyword "NEXSPC 4.0" found 7 articles (current page)

Faking Cpk: Why the Shop Floor Isn't Entirely to Blame

Discover why manufacturing shop floors fake Cpk data. Uncover the truth behind rigid audit standards, measurement errors, and normal distribution myths, and learn how automated SPC systems like NEXSPC 4.0 build true data integrity.…

Faking Cpk: Why the Shop Floor Isn't Entirely to Blame

New AIAG-VDA SPC Manual: The 5 Non-Negotiable Prerequisites for CPK Calculation

Discover the 5 non-negotiable prerequisites for CPK calculation under the new AIAG-VDA SPC manual. Learn why MSA, control charts, normality tests, 25 subgroups, and data traceability are mandatory for process capability, and how NEXSPC 4.0 automates compliance.…

New AIAG-VDA SPC Manual: The 5 Non-Negotiable Prerequisites for CPK Calculation